What's New


NOTICE
CEDD Contract No. : NE/2017/05
Temporary Closure of the Slip Road Leading from Fo Tan
to Tai Po Road – Sha Tin Section &
a Section of Tai Po Road – Sha Tin Section (Kowloon Direction) near Wo Che Estate with Alternative Routes


Date: 3 April 2024

In order to facilitate the construction works under “Road Widening and Retrofitting Noise Barriers on Tai Po Road (Sha Tin Section)” project, the slip road leading from Fo Tan Road to Tai Po Road – Sha Tin Section and Tai Po Road – Sha Tin Section (heading to Kowloon direction) near Wo Che Estate would be temporarily closed from 1 a.m. to 5 a.m. on 9 April 2024 for installation of noise barrier and road works.

During the construction period, the affected carriageway will be temporarily closed to all vehicular traffic. All vehicles shall take the alternative routes to Kowloon (West) and Tsuen Wan with the following temporary traffic arrangements (refer to the attached Figure):

  1. Road Closure
    1. A section of Tai Po Road – Sha Tin (Southbound) near Wo Che Estate
  2. Ban Turning
    1. All vehicles will be temporarily prohibited from making right turn movement from Fo Tan Road (Southbound) to Tai Po Road – Sha Tin (Southbound)
    2. All vehicles will be temporarily prohibited from making left turn movement from Fo Tan Road (Northbound) to Tai Po Road – Sha Tin (Southbound)
  3. Traffic Diversion
    1. Vehicles towards Kowloon (West) and Tsuen Wan Direction will be diverted via Yuen Wo Road (Southbound) and Sha Tin Rural Committee Road (Westbound)

    Appropriate traffic signs will be erected on site to guide motorists in the above mentioned location during the temporary road diversion.

    We apologize for any inconvenience caused. Should you have any enquiry, please do not hesitate to call our 24-hour Hotline 5613-3367 to contact us.

    China Railway–China Railway First Group–Zhen Hua Engineering Joint Venture

Top